
Cost Modeling
Value
IDCs cost modeling specialists offer an invaluable advantage
to semiconductor manufacturers by identifying opportunities for
savings and performance acceleration in the earliest stages of facility
design.
Services
IDC develops preliminary cost estimates at a conceptual level
by using our version of the SEMATECH Facilities Cost Model. IDC
developed the model for SEMATECH and is the only entity outside
the SEMATECH membership with the right to use it. The data driving
our cost model are not theoretical; they are derived from field
testing and facility performance data.
Expertise
The cost model addresses:
|
|
Site development
|
|
|
Electrical systems
|
|
|
Structural/building shell
|
|
|
Instrumentation and controls systems
|
|
|
Architectural interiors
|
|
|
Life safety systems
|
|
|
Cleanroom
|
|
|
Process systems
|
|
|
Mechanical systems
|
|
|
Indirect costs
|
|